Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
WILLOWBROOKE COURT-SPRING HOUS
LOWER GWYNEDD, PA · 16 certified beds · Last Life Safety survey April 2, 2026
CMS Certification Number 395495 · first certified January 1981
Ownership
Operated by ACTS RETIREMENT-LIFE COMMUNITIES · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within PA
11 citations — more than 51% of the 656 certified nursing homes in PA. Compared within PA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 0 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens February 2027 — about 4 months from now. This facility’s last Life Safety survey was April 2026. Facilities in PA are typically surveyed 10–12 months after the last one (median 11), measured over 1,113 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about WILLOWBROOKE COURT-SPRING HOUS
One email when it happens. No account; stop it any time with one click.
How that compares
Compared with the median facility in PA, and nationally. Surveyors differ markedly between states, so the PA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in PA | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 28, 2024 | 6 |
| April 17, 2025 | 5 |
| April 2, 2026 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 2 | 2025-04-17 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2024-05-28 |
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | 1 | 2024-05-28 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-05-28 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2024-05-28 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2025-04-17 |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | 1 | 2025-04-17 |
| K-0133 | Install a two-hour-resistant firewall separation. | 1 | 2025-04-17 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Smoke Deficiencies 2
- Construction Deficiencies 2
- Egress Deficiencies 1
- Other 2
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Smoke Deficiencies | 2 |
| Construction Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Services Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 17, 2025 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0133 | Install a two-hour-resistant firewall separation. | Deficient, Provider has date of correction (May 30, 2025) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (May 30, 2025) |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (May 30, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (May 30, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (May 30, 2025) |
May 28, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | Deficient, Provider has date of correction (August 1, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (August 1, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (August 1, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (August 1, 2024) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (August 1, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (August 1, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.