Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
HOPKINS CENTER
WYNCOTE, PA · 106 certified beds · Last Life Safety survey July 17, 2026
CMS Certification Number 395342 · first certified May 1976
Ownership
Operated by GENESIS HEALTHCARE · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within PA
48 citations — more than 100% of the 656 certified nursing homes in PA. Compared within PA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 12 citations; the earlier surveys on file averaged 18. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens June 2027 — about 7 months from now. This facility’s last Life Safety survey was July 2026. Facilities in PA are typically surveyed 11–12 months after the last one (median 11), measured over 1,101 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about HOPKINS CENTER
One email when it happens. No account; stop it any time with one click.
7 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
11 of the 48 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
15 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 48 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
How that compares
Compared with the median facility in PA, and nationally. Surveyors differ markedly between states, so the PA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 48 |
| Median facility in PA | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 13, 2025 | 11 |
| August 7, 2025 | 25 |
| July 17, 2026 | 12 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2026-07-17 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 3 | 2026-07-17 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2026-07-17 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2026-07-17 |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | 2 | 2026-07-17 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 2 | 2026-07-17 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2025-08-07 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2025-08-07 |
What the citations cover
- Smoke Deficiencies 13
- Emergency Preparedness Deficiencies 11
- Gas, Vacuum, and Electrical Systems Deficiencies 7
- Egress Deficiencies 6
- Other 11
| Category | Citations |
|---|---|
| Smoke Deficiencies | 13 |
| Emergency Preparedness Deficiencies | 11 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 7 |
| Egress Deficiencies | 6 |
| Services Deficiencies | 6 |
| Miscellaneous Deficiencies | 4 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 17, 2026 — 12 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (September 2, 2026) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (September 2, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 2, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 2, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 2, 2026) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has plan of correction |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (September 2, 2026) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (September 2, 2026) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (September 2, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (September 2, 2026) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (September 2, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 2, 2026) |
August 7, 2025 — 25 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (September 17, 2025) |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (September 17, 2025) |
| E-0007 | Address patient/client population and determine types of services needed. | Deficient, Provider has date of correction (September 17, 2025) |
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (September 17, 2025) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (September 17, 2025) |
| E-0018 | Establish procedures for tracking staff and patients during an emergency. | Deficient, Provider has date of correction (September 17, 2025) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (September 17, 2025) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (September 17, 2025) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (September 17, 2025) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (September 17, 2025) |
March 13, 2025 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (April 30, 2025) |
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (April 30, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 30, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 30, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 30, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (April 30, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 30, 2025) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (April 30, 2025) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (April 30, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 30, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 30, 2025) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.