Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Greenville Operations RI LLC DBA Greenville Skille

Greenville, RI · 131 certified beds · Last Life Safety survey March 12, 2026

CMS Certification Number 415087 · first certified October 1990

Ownership

Independently operated (no chain recorded by CMS) · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

8
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
4
Inspection & testing records
Of the citations on file

Position within RI

8 citations — more than 66% of the 72 certified nursing homes in RI. Compared within RI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 0 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens February 2027 — about 5 months from now. This facility’s last Life Safety survey was March 2026. Facilities in RI are typically surveyed 11–14 months after the last one (median 12), measured over 117 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Greenville Operations RI LLC DBA Greenville Skille

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in RI, and nationally. Surveyors differ markedly between states, so the RI figure is the meaningful one.

This facility8RI median4National median11
Citations on file over three years, compared
MeasureCitations
This facility8
Median facility in RI4
Median facility nationally11

Survey history

Citations at each Life Safety survey
72023-1212024-1202026-03
Citations at each Life Safety survey
Survey dateCitations
December 21, 20237
December 5, 20241
March 12, 20260

Most-cited tags

Most-cited tags at this facility
K-03511K-03631K-07121K-09281K-09201K-02931K-09181K-03531
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0351Install an approved automatic sprinkler system.12023-12-21
K-0363Install corridor and hallway doors that block smoke.12024-12-05
K-0712Have simulated fire drills held at unexpected times.12023-12-21
K-0928Ensure equipment listed for use in oxygen-enriched atmospheres are correctly labeled.12023-12-21
K-0920Ensure proper usage of power strips and extension cords.12023-12-21
K-0293Have properly located and lighted "Exit" signs.12023-12-21
K-0918Have generator or other power source capable of supplying service within 10 seconds.12023-12-21
K-0353Inspect, test, and maintain automatic sprinkler systems.12023-12-21

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Smoke Deficiencies 3
  • Egress Deficiencies 1
  • Miscellaneous Deficiencies 1
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies3
Smoke Deficiencies3
Egress Deficiencies1
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

December 5, 2024 — 1 citation

Citations issued on December 5, 2024
TagWhat the surveyor checksStatus
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (January 3, 2025)

December 21, 2023 — 7 citations

Citations issued on December 21, 2023
TagWhat the surveyor checksStatus
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (January 20, 2024)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (January 20, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 20, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (January 20, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (January 20, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (January 20, 2024)
K-0928Ensure equipment listed for use in oxygen-enriched atmospheres are correctly labeled.Deficient, Provider has date of correction (January 20, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.