Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Overlook Nursing and Rehabilitation Center
Pascoag, RI · 100 certified beds · Last Life Safety survey May 6, 2025
CMS Certification Number 415045 · first certified March 1989
Ownership
Operated by EDEN HEALTHCARE · For profit - Limited Liability company
- Ownership changed December 1, 2019 (change of ownership)to OVERLOOK EDEN OPERATIONS LLC from HARKEN INC
Position within RI
14 citations — more than 90% of the 72 certified nursing homes in RI. Compared within RI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (April 2026 to June 2026), and past the point by which nine in ten RI facilities have been surveyed. This facility’s last Life Safety survey was May 2025. Facilities in RI are typically surveyed 11–14 months after the last one (median 12), measured over 117 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Overlook Nursing and Rehabilitation Center
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in RI, and nationally. Surveyors differ markedly between states, so the RI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 14 |
| Median facility in RI | 4 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 25, 2023 | 3 |
| June 14, 2024 | 4 |
| May 6, 2025 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2025-05-06 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2025-05-06 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2023-05-25 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-05-06 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-06-14 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2025-05-06 |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | 1 | 2025-05-06 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2023-05-25 |
What the citations cover
- Egress Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Smoke Deficiencies 3
- Miscellaneous Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Egress Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Smoke Deficiencies | 3 |
| Miscellaneous Deficiencies | 2 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 6, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (June 5, 2025) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (June 5, 2025) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (June 5, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 5, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 5, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (June 5, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 5, 2025) |
June 14, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (July 14, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (July 14, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (July 14, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 14, 2024) |
May 25, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (June 24, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (June 24, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 24, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.