Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Cedar Haven Operations LLC DBA Lake Forrest Health
Smithfield, RI · 133 certified beds · Last Life Safety survey January 2, 2026
CMS Certification Number 415049 · first certified November 1977
Ownership
Independently operated (no chain recorded by CMS) · For profit - Individual
- New ownershipOwnership changed June 1, 2025 (change of ownership)to LAKE FOREST HEALTH & REHABILITATION LLC from ASLC RI II LLC
Position within RI
11 citations — more than 82% of the 72 certified nursing homes in RI. Compared within RI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2026 — about 3 months from now. This facility’s last Life Safety survey was January 2026. Facilities in RI are typically surveyed 11–14 months after the last one (median 12), measured over 117 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Cedar Haven Operations LLC DBA Lake Forrest Health
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
11 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in RI, and nationally. Surveyors differ markedly between states, so the RI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in RI | 4 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 19, 2023 | 5 |
| October 10, 2024 | 3 |
| January 2, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2026-01-02 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2024-10-10 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2024-10-10 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-10-10 |
| K-0300 | Meet other general requirements that are deficient. | 1 | 2023-10-19 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2026-01-02 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2026-01-02 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-10-19 |
What the citations cover
- Smoke Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 2
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 2, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 1, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 1, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 1, 2026) |
October 10, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 9, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (November 9, 2024) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (November 9, 2024) |
October 19, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (November 18, 2023) |
| K-0300 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (November 18, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (November 18, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 18, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 18, 2023) |