Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

GREYSTONE HEALTH CARE CENTER

BLOUNTVILLE, TN · 160 certified beds · Last Life Safety survey April 14, 2025

CMS Certification Number 445242 · first certified December 1989

Ownership

Operated by PRESTIGE ADMINISTRATIVE SERVICES · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

11
Citations on file
Rolling three-year window
4
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
2
Inspection & testing records
Of the citations on file

Position within TN

11 citations — more than 66% of the 303 certified nursing homes in TN. Compared within TN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 3.3. With 4 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: July 2026 to December 2028. This facility’s last Life Safety survey was April 2025. Facilities in TN are typically surveyed 15–44 months after the last one (median 33), measured over 279 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about GREYSTONE HEALTH CARE CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

1 of the 11 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.

How that compares

Citations on file over three years

Compared with the median facility in TN, and nationally. Surveyors differ markedly between states, so the TN figure is the meaningful one.

This facility11TN median8National median11
Citations on file over three years, compared
MeasureCitations
This facility11
Median facility in TN8
Median facility nationally11

Survey history

Citations at each Life Safety survey
52019-1012021-1042024-1012025-04
Citations at each Life Safety survey
Survey dateCitations
October 8, 20195
October 13, 20211
October 30, 20244
April 14, 20251

Most-cited tags

Most-cited tags at this facility
K-03212K-01611K-05311K-09211K-03631K-09111K-07811K-03111
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22024-10-30
K-0161Use approved construction type or materials.12019-10-08
K-0531Have elevators that firefighters can control in the event of a fire.12019-10-08
K-0921Ensure that testing and maintenance of electrical equipment is performed.12021-10-13
K-0363Install corridor and hallway doors that block smoke.12024-10-30
K-0911Meet requirements for the installation and maintenance of electrical systems.12025-04-14
K-0781Have restrictions on the use of portable space heaters.12024-10-30
K-0311Have an enclosure around a vertical opening shaft.12019-10-08

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 4
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Services Deficiencies 2
  • Construction Deficiencies 1
  • Other 2
Citations by CMS category
CategoryCitations
Smoke Deficiencies4
Gas, Vacuum, and Electrical Systems Deficiencies2
Services Deficiencies2
Construction Deficiencies1
Miscellaneous Deficiencies1
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 14, 2025 — 1 citation

Citations issued on April 14, 2025
TagWhat the surveyor checksStatus
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (May 2, 2025)

October 30, 2024 — 4 citations

Citations issued on October 30, 2024
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (November 29, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (November 29, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (November 29, 2024)
K-0781Have restrictions on the use of portable space heaters.Deficient, Provider has date of correction (November 29, 2024)

October 13, 2021 — 1 citation

Citations issued on October 13, 2021
TagWhat the surveyor checksStatus
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (December 1, 2021)

October 8, 2019 — 5 citations

Citations issued on October 8, 2019
TagWhat the surveyor checksStatus
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (November 22, 2019)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (November 22, 2019)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (November 22, 2019)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (November 22, 2019)
K-0531Have elevators that firefighters can control in the event of a fire.Deficient, Provider has date of correction (November 22, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.