Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

HUNTSVILLE POST-ACUTE AND REHABILITATION CENTER

HUNTSVILLE, TN · 96 certified beds · Last Life Safety survey November 19, 2025

CMS Certification Number 445288 · first certified April 1992

Ownership

Operated by PLAINVIEW HEALTHCARE PARTNERS · For profit - Corporation

  • Ownership changed November 1, 2018 (change of ownership)from HUNTSVILLE NH OPERATIONS LLC
10
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
7
Inspection & testing records
Of the citations on file

Position within TN

10 citations — more than 60% of the 303 certified nursing homes in TN. Compared within TN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens February 2027 — about 5 months from now. This facility’s last Life Safety survey was November 2025. Facilities in TN are typically surveyed 15–44 months after the last one (median 33), measured over 279 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about HUNTSVILLE POST-ACUTE AND REHABILITATION CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 10 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

8 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.

How that compares

Citations on file over three years

Compared with the median facility in TN, and nationally. Surveyors differ markedly between states, so the TN figure is the meaningful one.

This facility10TN median8National median11
Citations on file over three years, compared
MeasureCitations
This facility10
Median facility in TN8
Median facility nationally11

Survey history

Citations at each Life Safety survey
32021-1132024-0842025-11
Citations at each Life Safety survey
Survey dateCitations
November 4, 20213
August 21, 20243
November 19, 20254

Most-cited tags

Most-cited tags at this facility
K-09183K-03242K-03531K-02221K-03211E-00061K-05111
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.32025-11-19
K-0324Provide properly protected cooking facilities.22025-11-19
K-0353Inspect, test, and maintain automatic sprinkler systems.12025-11-19
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12025-11-19
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12021-11-04
E-0006Conduct risk assessment and an All-Hazards approach.12021-11-04
K-0511Have properly installed electrical wiring and gas equipment.12024-08-21

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 4
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Emergency Preparedness Deficiencies 1
  • Egress Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies4
Gas, Vacuum, and Electrical Systems Deficiencies3
Emergency Preparedness Deficiencies1
Egress Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

November 19, 2025 — 4 citations

Citations issued on November 19, 2025
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (November 21, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (November 21, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (November 21, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (November 21, 2025)

August 21, 2024 — 3 citations

Citations issued on August 21, 2024
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (August 23, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (August 23, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (August 23, 2024)

November 4, 2021 — 3 citations

Citations issued on November 4, 2021
TagWhat the surveyor checksStatus
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (December 10, 2021)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (December 10, 2021)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (December 10, 2021)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.