Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

DESOTO NURSING & REHABILITATION CENTER

DESOTO, TX · 110 certified beds · Last Life Safety survey February 12, 2026

CMS Certification Number 455994 · first certified February 1992

Ownership

Operated by CREATIVE SOLUTIONS IN HEALTHCARE · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

18
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
6
Tags cited more than once
Across separate surveys
11
Inspection & testing records
Of the citations on file

Position within TX

18 citations — more than 92% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 7.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens March 2027 — about 6 months from now. This facility’s last Life Safety survey was February 2026. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,905 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about DESOTO NURSING & REHABILITATION CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 18 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 18 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.

This facility18TX median7National median11
Citations on file over three years, compared
MeasureCitations
This facility18
Median facility in TX7
Median facility nationally11

Survey history

Citations at each Life Safety survey
72023-1082024-1132026-02
Citations at each Life Safety survey
Survey dateCitations
October 5, 20237
November 21, 20248
February 12, 20263

Most-cited tags

Most-cited tags at this facility
K-03722K-03212K-09182K-02222K-03632K-03242K-02111K-07121
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.22024-11-21
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22024-11-21
K-0918Have generator or other power source capable of supplying service within 10 seconds.22026-02-12
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.22024-11-21
K-0363Install corridor and hallway doors that block smoke.22026-02-12
K-0324Provide properly protected cooking facilities.22024-11-21
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12024-11-21
K-0712Have simulated fire drills held at unexpected times.12024-11-21

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 10
  • Egress Deficiencies 3
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Emergency Preparedness Deficiencies 1
  • Other 2
Citations by CMS category
CategoryCitations
Smoke Deficiencies10
Egress Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies2
Emergency Preparedness Deficiencies1
Services Deficiencies1
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

February 12, 2026 — 3 citations

Citations issued on February 12, 2026
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (February 12, 2026)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (February 12, 2026)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (February 12, 2026)

November 21, 2024 — 8 citations

Citations issued on November 21, 2024
TagWhat the surveyor checksStatus
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (November 21, 2024)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (November 21, 2024)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (November 21, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (November 21, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (November 21, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (November 21, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (November 21, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (November 21, 2024)

October 5, 2023 — 7 citations

Citations issued on October 5, 2023
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (November 17, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (November 17, 2023)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (November 17, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (November 17, 2023)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (November 17, 2023)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (November 17, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (November 17, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.