Beltline Healthcare Center
Garland, TX · 120 certified beds · Last Life Safety survey February 12, 2026
CMS Certification Number 675822 · first certified March 2000
Ownership
Operated by CREATIVE SOLUTIONS IN HEALTHCARE · For profit - Limited Liability company
- Ownership changed December 1, 2023 (change of ownership)from BELTLINE SCC LLC
Position within TX
5 citations — more than 28% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 6 months from now. This facility’s last Life Safety survey was February 2026. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,905 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Beltline Healthcare Center
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 5 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 5 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 28, 2023 | 1 |
| November 7, 2024 | 3 |
| February 12, 2026 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2024-11-07 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2026-02-12 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2024-11-07 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-09-28 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2024-11-07 |
What the citations cover
- Egress Deficiencies 3
- Smoke Deficiencies 2
| Category | Citations |
|---|---|
| Egress Deficiencies | 3 |
| Smoke Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 12, 2026 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (February 13, 2026) |
November 7, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (November 25, 2024) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (November 25, 2024) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (November 25, 2024) |
September 28, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (November 10, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.