Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
SOUTHLAND REHABILITATION AND HEALTHCARE CENTER
LUFKIN, TX · 150 certified beds · Last Life Safety survey January 7, 2026
CMS Certification Number 675962 · first certified May 2003
Ownership
Operated by THE ENSIGN GROUP · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within TX
5 citations — more than 28% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens February 2027 — about 5 months from now. This facility’s last Life Safety survey was January 2026. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,905 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about SOUTHLAND REHABILITATION AND HEALTHCARE CENTER
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
8 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 5 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 5 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 18, 2023 | 2 |
| November 6, 2024 | 2 |
| January 7, 2026 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-11-06 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-10-18 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2026-01-07 |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | 1 | 2023-10-18 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-11-06 |
What the citations cover
- Smoke Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 7, 2026 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 6, 2026) |
November 6, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (November 7, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (November 7, 2024) |
October 18, 2023 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (December 15, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 25, 2023) |