Operated by CANTEX CONTINUING CARE · For profit - Corporation
- Ownership changed May 1, 2020 (change of ownership)from COMAL HEALTH CARE CENTER LTD. CO.
Position within TX
13 citations — more than 79% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 8 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026. This facility’s last Life Safety survey was August 2025. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,905 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Sundance Inn Health Center
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 13 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 13 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 13 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 20, 2023 | 3 |
| June 27, 2024 | 2 |
| August 28, 2025 | 8 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-08-28 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2025-08-28 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2025-08-28 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2024-06-27 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2025-08-28 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2025-08-28 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2023-04-20 |
| K-0929 | Ensure precautions for handling oxygen cylinders and equipment are correctly followed. | 1 | 2023-04-20 |
What the citations cover
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Emergency Preparedness Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Emergency Preparedness Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 28, 2025 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (September 30, 2025) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (August 29, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (August 29, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 29, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (August 29, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (August 29, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (August 29, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 30, 2025) |
June 27, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 10, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (August 10, 2024) |
April 20, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 26, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 26, 2023) |