Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CEDAR HOLLOW REHABILITATION CENTER
SHERMAN, TX · 142 certified beds · Last Life Safety survey May 7, 2026
CMS Certification Number 676488 · first certified June 2020
Ownership
Operated by HAMILTON COUNTY HOSPITAL DISTRICT · Government - Hospital district
- Ownership changed June 1, 2023 (change of ownership)from GO OPERATIONS 7 LLC
Position within TX
4 citations — more than 20% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 0 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens June 2027 — about 9 months from now. This facility’s last Life Safety survey was May 2026. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,905 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CEDAR HOLLOW REHABILITATION CENTER
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 4 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 4 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 1, 2024 | 2 |
| March 6, 2025 | 2 |
| May 7, 2026 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-03-06 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2025-03-06 |
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | 1 | 2024-02-01 |
| K-0929 | Ensure precautions for handling oxygen cylinders and equipment are correctly followed. | 1 | 2024-02-01 |
What the citations cover
- Smoke Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 6, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 28, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 28, 2025) |
February 1, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | Deficient, Provider has date of correction (February 22, 2024) |
| K-0929 | Ensure precautions for handling oxygen cylinders and equipment are correctly followed. | Deficient, Provider has date of correction (February 14, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.