Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Millcreek Rehabilitation and Nursing

Salt Lake City, UT · 61 certified beds · Last Life Safety survey January 21, 2026

CMS Certification Number 465185 · first certified April 2016

Ownership

Operated by BEAVER VALLEY HOSPITAL · Government - City/county

No change of ownership on CMS record since January 1, 2016, when the records begin.

16
Citations on file
Rolling three-year window
4
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
3
Inspection & testing records
Of the citations on file

Position within UT

16 citations — more than 88% of the 97 certified nursing homes in UT. Compared within UT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 5. With 4 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens August 2027 — about 11 months from now. This facility’s last Life Safety survey was January 2026. Facilities in UT are typically surveyed 19–24 months after the last one (median 21), measured over 88 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Millcreek Rehabilitation and Nursing

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

3 of the 16 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

9 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 16 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0924 Put firmly secured handrails on each side of hallways.

How that compares

Citations on file over three years

Compared with the median facility in UT, and nationally. Surveyors differ markedly between states, so the UT figure is the meaningful one.

This facility16UT median3National median11
Citations on file over three years, compared
MeasureCitations
This facility16
Median facility in UT3
Median facility nationally11

Survey history

Citations at each Life Safety survey
42021-0942023-0672025-0312026-01
Citations at each Life Safety survey
Survey dateCitations
September 30, 20214
June 15, 20234
March 31, 20257
January 21, 20261

Most-cited tags

Most-cited tags at this facility
K-03212E-00392K-03741K-02111K-02251K-03721K-09201E-00041
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22025-03-31
E-0039Conduct testing and exercise requirements.22025-03-31
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12021-09-30
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12026-01-21
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.12025-03-31
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12021-09-30
K-0920Ensure proper usage of power strips and extension cords.12023-06-15
E-0004Develop and maintain an Emergency Preparedness Program (EP).12025-03-31

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Smoke Deficiencies 4
  • Emergency Preparedness Deficiencies 3
  • Egress Deficiencies 2
  • Other 2
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies5
Smoke Deficiencies4
Emergency Preparedness Deficiencies3
Egress Deficiencies2
Miscellaneous Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

January 21, 2026 — 1 citation

Citations issued on January 21, 2026
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (January 22, 2026)

March 31, 2025 — 7 citations

Citations issued on March 31, 2025
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (April 11, 2025)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (April 11, 2025)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (April 11, 2025)
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (April 11, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (April 11, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (April 11, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (April 11, 2025)

June 15, 2023 — 4 citations

Citations issued on June 15, 2023
TagWhat the surveyor checksStatus
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (July 13, 2023)
K-0906Ensure gas cylinders are properly stored.Deficient, Provider has date of correction (July 13, 2023)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (July 3, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (July 13, 2023)

September 30, 2021 — 4 citations

Citations issued on September 30, 2021
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (September 29, 2021)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (September 29, 2021)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (September 29, 2021)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (September 29, 2021)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.