Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Stonehenge of Springville
Springville, UT · 50 certified beds · Last Life Safety survey March 5, 2025
CMS Certification Number 465130 · first certified September 1992
Ownership
Operated by STONEHENGE OF UTAH · Government - Hospital district
- Ownership changed December 11, 2017 (change of ownership)from STONEHENGE OF SPRINGVILLEUT INC
Position within UT
7 citations — more than 65% of the 97 certified nursing homes in UT. Compared within UT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026. This facility’s last Life Safety survey was March 2025. Facilities in UT are typically surveyed 19–24 months after the last one (median 21), measured over 88 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Stonehenge of Springville
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in UT, and nationally. Surveyors differ markedly between states, so the UT figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 7 |
| Median facility in UT | 3 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 5, 2021 | 1 |
| May 17, 2023 | 4 |
| March 5, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 2 | 2025-03-05 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2025-03-05 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2023-05-17 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2021-08-05 |
| K-0200 | Meet other general requirements. | 1 | 2023-05-17 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-05-17 |
What the citations cover
- Egress Deficiencies 4
- Miscellaneous Deficiencies 1
- Smoke Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Egress Deficiencies | 4 |
| Miscellaneous Deficiencies | 1 |
| Smoke Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 5, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (March 12, 2025) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (March 5, 2025) |
May 17, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0200 | Meet other general requirements. | Deficient, Provider has date of correction (July 1, 2023) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (July 1, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (July 1, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 1, 2023) |
August 5, 2021 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (September 30, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.