Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Langley Post Acute
HAMPTON, VA · 70 certified beds · Last Life Safety survey October 3, 2024
CMS Certification Number 495367 · first certified July 2003
Ownership
Operated by MARQUIS HEALTH SERVICES · For profit - Corporation
- New ownershipOwnership changed September 11, 2025 (change of ownership)from VIRGINIA HEALTH SERVICES, INC
Position within VA
6 citations — more than 26% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 7 months from now. This facility’s last Life Safety survey was October 2024. Facilities in VA are typically surveyed 31–43 months after the last one (median 37), measured over 125 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Langley Post Acute
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
3 of the 6 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in VA | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 6, 2019 | 0 |
| April 29, 2021 | 5 |
| October 3, 2024 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | 1 | 2021-04-29 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2021-04-29 |
| E-0036 | Establish emergency prep training and testing. | 1 | 2021-04-29 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2021-04-29 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2021-04-29 |
| E-0037 | Establish staff and initial training requirements. | 1 | 2024-10-03 |
What the citations cover
- Emergency Preparedness Deficiencies 3
- Smoke Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 3 |
| Smoke Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
October 3, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (November 15, 2024) |
April 29, 2021 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (June 10, 2021) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (June 10, 2021) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (August 2, 2021) |
| K-0351 | Install an approved automatic sprinkler system. | Waiver has been granted (August 2, 2021) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Waiver has been granted (August 2, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.