Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
DULLES HEALTH & REHAB CENTER
HERNDON, VA · 166 certified beds · Last Life Safety survey March 26, 2026
CMS Certification Number 495174 · first certified December 1987
Ownership
Operated by COMMONWEALTH CARE OF ROANOKE · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within VA
12 citations — more than 56% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 0 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2028 — about 25 months from now. This facility’s last Life Safety survey was March 2026. Facilities in VA are typically surveyed 31–43 months after the last one (median 37), measured over 125 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about DULLES HEALTH & REHAB CENTER
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 12 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 12 |
| Median facility in VA | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 27, 2018 | 9 |
| August 4, 2021 | 3 |
| March 26, 2026 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2018-09-27 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2018-09-27 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2021-08-04 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2018-09-27 |
| K-0325 | Have properly installed hallway dispensers for alcohol-based hand rub. | 1 | 2018-09-27 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2021-08-04 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2018-09-27 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2018-09-27 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Egress Deficiencies 3
- Smoke Deficiencies 3
- Services Deficiencies 2
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Egress Deficiencies | 3 |
| Smoke Deficiencies | 3 |
| Services Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 4, 2021 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 30, 2021) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (September 30, 2021) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (September 30, 2021) |
September 27, 2018 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (February 5, 2019) |
| K-0325 | Have properly installed hallway dispensers for alcohol-based hand rub. | Deficient, Provider has date of correction (February 5, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 5, 2019) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (February 5, 2019) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (February 5, 2019) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (February 5, 2019) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 5, 2019) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 5, 2019) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (February 5, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.