Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

SKYVIEW SPRINGS REHAB AND NURSING CENTER

LURAY, VA · 120 certified beds · Last Life Safety survey November 2, 2023

CMS Certification Number 495255 · first certified September 1991

Ownership

Operated by HILL VALLEY HEALTHCARE · For profit - Limited Liability company

  • Ownership changed June 1, 2021 (change of ownership)from MV OPERATIONS LLC
21
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
3
Inspection & testing records
Of the citations on file

Position within VA

21 citations — more than 85% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 9. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: June 2026 to June 2027. This facility’s last Life Safety survey was November 2023. Facilities in VA are typically surveyed 31–43 months after the last one (median 37), measured over 125 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about SKYVIEW SPRINGS REHAB AND NURSING CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

6 of the 21 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 21 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.

How that compares

Citations on file over three years

Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.

This facility21VA median10National median11
Citations on file over three years, compared
MeasureCitations
This facility21
Median facility in VA10
Median facility nationally11

Survey history

Citations at each Life Safety survey
102019-1182022-0232023-11
Citations at each Life Safety survey
Survey dateCitations
November 18, 201910
February 8, 20228
November 2, 20233

Most-cited tags

Most-cited tags at this facility
K-03721E-00361E-00341K-09111K-02221K-01611K-03411K-02231
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12019-11-18
E-0036Establish emergency prep training and testing.12022-02-08
E-0034Provide a means of sharing information on occupancy/needs.12022-02-08
K-0911Meet requirements for the installation and maintenance of electrical systems.12023-11-02
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12023-11-02
K-0161Use approved construction type or materials.12019-11-18
K-0341Install a fire alarm system that can be heard throughout the facility.12019-11-18
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.12019-11-18

What the citations cover

Citations by CMS category
  • Emergency Preparedness Deficiencies 6
  • Egress Deficiencies 5
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Smoke Deficiencies 3
  • Other 3
Citations by CMS category
CategoryCitations
Emergency Preparedness Deficiencies6
Egress Deficiencies5
Gas, Vacuum, and Electrical Systems Deficiencies4
Smoke Deficiencies3
Miscellaneous Deficiencies1
Construction Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

November 2, 2023 — 3 citations

Citations issued on November 2, 2023
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (March 29, 2024)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (March 29, 2024)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (March 29, 2024)

February 8, 2022 — 8 citations

Citations issued on February 8, 2022
TagWhat the surveyor checksStatus
E-0007Address patient/client population and determine types of services needed.Deficient, Provider has date of correction (March 18, 2022)
E-0018Establish procedures for tracking staff and patients during an emergency.Deficient, Provider has date of correction (March 18, 2022)
E-0034Provide a means of sharing information on occupancy/needs.Deficient, Provider has date of correction (March 18, 2022)
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (March 18, 2022)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (March 18, 2022)
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (March 18, 2022)
K-0915Have proper power supply for life support equipment.Deficient, Provider has date of correction (March 22, 2022)
K-0916Have a battery powered remote alarm panel in a location accessible by operating personnel.Deficient, Provider has date of correction (March 22, 2022)

November 18, 2019 — 10 citations

Citations issued on November 18, 2019
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (January 22, 2020)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (January 22, 2020)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (January 22, 2020)
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (January 22, 2020)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (January 22, 2020)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (January 22, 2020)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 22, 2020)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (January 22, 2020)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (January 22, 2020)
K-0753Have restrictions on the use of highly flammable decorations.Deficient, Provider has date of correction (January 22, 2020)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.