Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Birmingham Green
MANASSAS, VA · 180 certified beds · Last Life Safety survey January 11, 2024
CMS Certification Number 495390 · first certified November 2006
Also on this campus
The same campus holds a state-licensed assisted living facility, with its own state record on the Assisted Living Index: District Home Assisted Living at Birmingham Green (8605 Centreville Road). Matched by the telephone number the two records share. The records are separate and are never added together.
Ownership
Independently operated (no chain recorded by CMS) · Government - City/county
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within VA
10 citations — more than 47% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 0 citations; the earlier surveys on file averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: September 2026 to October 2027. This facility’s last Life Safety survey was January 2024. Facilities in VA are typically surveyed 32–45 months after the last one (median 38), measured over 123 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about Birmingham Green
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
2 of the 10 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 10 |
| Median facility in VA | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 6, 2018 | 7 |
| January 31, 2020 | 3 |
| January 11, 2024 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | 1 | 2020-01-31 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2020-01-31 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2018-03-06 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2018-03-06 |
| E-0035 | Provide family notifications of emergency plan. | 1 | 2018-03-06 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2018-03-06 |
| E-0037 | Establish staff and initial training requirements. | 1 | 2018-03-06 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2020-01-31 |
What the citations cover
- Smoke Deficiencies 3
- Emergency Preparedness Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Egress Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 31, 2020 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (March 15, 2021) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (March 15, 2021) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (March 15, 2021) |
March 6, 2018 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0035 | Provide family notifications of emergency plan. | Deficient, Provider has date of correction (April 20, 2018) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (April 20, 2018) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 16, 2018) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 16, 2018) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (April 16, 2018) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 16, 2018) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 16, 2018) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.