Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

PORTSIDE HEALTH & REHAB CENTER

PORTSMOUTH, VA · 132 certified beds · Last Life Safety survey December 12, 2024

CMS Certification Number 495201 · first certified September 1989

Ownership

Operated by SABER HEALTHCARE GROUP · For profit - Corporation

  • Ownership changed July 1, 2019 (change of ownership)from SENTARA LIFE CARE CORPORATION
7
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
3
Inspection & testing records
Of the citations on file

Position within VA

7 citations — more than 33% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens July 2027 — about 9 months from now. This facility’s last Life Safety survey was December 2024. Facilities in VA are typically surveyed 31–43 months after the last one (median 37), measured over 125 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about PORTSIDE HEALTH & REHAB CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

1 of the 7 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index

  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.

This facility7VA median10National median11
Citations on file over three years, compared
MeasureCitations
This facility7
Median facility in VA10
Median facility nationally11

Survey history

Citations at each Life Safety survey
42019-0502021-0432024-12
Citations at each Life Safety survey
Survey dateCitations
May 1, 20194
April 1, 20210
December 12, 20243

Most-cited tags

Most-cited tags at this facility
K-02911K-02111K-01001K-03531K-09211E-00411K-03721
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0291Install emergency lighting that can last at least 1 1/2 hours.12024-12-12
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12019-05-01
K-0100Meet other general requirements.12019-05-01
K-0353Inspect, test, and maintain automatic sprinkler systems.12019-05-01
K-0921Ensure that testing and maintenance of electrical equipment is performed.12019-05-01
E-0041Implement emergency and standby power systems.12024-12-12
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12024-12-12

What the citations cover

Citations by CMS category
  • Egress Deficiencies 2
  • Smoke Deficiencies 2
  • Emergency Preparedness Deficiencies 1
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Egress Deficiencies2
Smoke Deficiencies2
Emergency Preparedness Deficiencies1
Gas, Vacuum, and Electrical Systems Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

December 12, 2024 — 3 citations

Citations issued on December 12, 2024
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (January 17, 2025)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (March 3, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (March 3, 2025)

May 1, 2019 — 4 citations

Citations issued on May 1, 2019
TagWhat the surveyor checksStatus
K-0100Meet other general requirements.Deficient, Provider has date of correction (July 31, 2019)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (July 31, 2019)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 31, 2019)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (July 31, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.