Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PORTSMOUTH HEALTH AND REHAB
PORTSMOUTH, VA · 120 certified beds · Last Life Safety survey May 28, 2021
CMS Certification Number 495149 · first certified October 1984
Ownership
Operated by TRIO HEALTHCARE · For profit - Corporation
- Ownership changed December 16, 2016 (change of ownership)from GGNSC PORTSMOUTH LLC
Position within VA
26 citations — more than 93% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 12. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (December 2023 to December 2024), and past the point by which nine in ten VA facilities have been surveyed. This facility’s last Life Safety survey was May 2021. Facilities in VA are typically surveyed 31–43 months after the last one (median 37), measured over 125 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PORTSMOUTH HEALTH AND REHAB
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 26 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
9 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 26 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
- F-0880 Provide and implement an infection prevention and control program.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 26 |
| Median facility in VA | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 13, 2017 | 18 |
| February 7, 2019 | 6 |
| May 28, 2021 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2019-02-07 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 2 | 2019-02-07 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2019-02-07 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 2 | 2019-02-07 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 1 | 2017-07-13 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2017-07-13 |
| K-0200 | Meet other general requirements. | 1 | 2017-07-13 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2019-02-07 |
What the citations cover
- Smoke Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 7
- Egress Deficiencies 5
- Miscellaneous Deficiencies 2
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 7 |
| Egress Deficiencies | 5 |
| Miscellaneous Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
| Services Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 28, 2021 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0915 | Have proper power supply for life support equipment. | Deficient, Provider has date of correction (June 10, 2021) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (June 10, 2021) |
February 7, 2019 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (March 9, 2019) |
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (April 2, 2019) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (April 2, 2019) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 2, 2019) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (April 2, 2019) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 2, 2019) |
July 13, 2017 — 18 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0200 | Meet other general requirements. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 2, 2017) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (October 2, 2017) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.