Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PULASKI HLTH & REHAB CNTR
PULASKI, VA · 90 certified beds · Last Life Safety survey June 23, 2023
CMS Certification Number 495294 · first certified January 1995
Ownership
Operated by LIFEWORKS REHAB · For profit - Limited Liability company
- Ownership changed May 28, 2021 (change of ownership)to PULASKI HEALTH & REHABILITION CENTER from MEDICAL FACILITIES OF AMERICA XIX
Position within VA
18 citations — more than 78% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 6 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: January 2026 to January 2027. This facility’s last Life Safety survey was June 2023. Facilities in VA are typically surveyed 31–43 months after the last one (median 37), measured over 125 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PULASKI HLTH & REHAB CNTR
One email when it happens. No account; stop it any time with one click.
4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 18 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 18 |
| Median facility in VA | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 3, 2019 | 1 |
| November 19, 2021 | 11 |
| June 23, 2023 | 6 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2023-06-23 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2023-06-23 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2023-06-23 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 2 | 2023-06-23 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2021-11-19 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2021-11-19 |
| K-0100 | Meet other general requirements. | 1 | 2019-01-03 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2021-11-19 |
What the citations cover
- Smoke Deficiencies 7
- Egress Deficiencies 3
- Services Deficiencies 3
- Miscellaneous Deficiencies 2
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Egress Deficiencies | 3 |
| Services Deficiencies | 3 |
| Miscellaneous Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 23, 2023 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (August 21, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 21, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Waiver has been granted (April 4, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Waiver has been granted (April 4, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (August 21, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Waiver has been granted (April 4, 2024) |
November 19, 2021 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (June 10, 2022) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (June 10, 2022) |
| K-0325 | Have properly installed hallway dispensers for alcohol-based hand rub. | Deficient, Provider has date of correction (February 25, 2022) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (February 25, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 10, 2022) |
| K-0363 | Install corridor and hallway doors that block smoke. | Waiver has been granted (August 16, 2022) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (June 10, 2022) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (February 25, 2022) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Waiver has been granted (January 17, 2023) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (February 25, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 25, 2022) |
January 3, 2019 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (February 21, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.