Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

WESTPORT REHABILITATION AND NURSING CENTER

RICHMOND, VA · 225 certified beds · Last Life Safety survey November 21, 2024

CMS Certification Number 495227 · first certified January 1991

Ownership

Operated by LIFEWORKS REHAB · For profit - Limited Liability company

  • Ownership changed January 1, 2020 (change of ownership)from WESTPORT OPERATIONS, LLC
11
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within VA

11 citations — more than 51% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens June 2027 — about 9 months from now. This facility’s last Life Safety survey was November 2024. Facilities in VA are typically surveyed 31–43 months after the last one (median 37), measured over 125 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about WESTPORT REHABILITATION AND NURSING CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 11 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

10 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.

This facility11VA median10National median11
Citations on file over three years, compared
MeasureCitations
This facility11
Median facility in VA10
Median facility nationally11

Survey history

Citations at each Life Safety survey
42021-1032022-1042024-11
Citations at each Life Safety survey
Survey dateCitations
October 5, 20214
October 19, 20223
November 21, 20244

Most-cited tags

Most-cited tags at this facility
K-03632K-09151K-03531K-07611K-03311K-01121E-00371K-02251
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0363Install corridor and hallway doors that block smoke.22022-10-19
K-0915Have proper power supply for life support equipment.12021-10-05
K-0353Inspect, test, and maintain automatic sprinkler systems.12024-11-21
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.12024-11-21
K-0331Construct fire resistant interior walls.12021-10-05
K-0112Add automatic sprinklers after major renovation.12022-10-19
E-0037Establish staff and initial training requirements.12021-10-05
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.12024-11-21

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 5
  • Egress Deficiencies 2
  • Miscellaneous Deficiencies 1
  • Construction Deficiencies 1
  • Other 2
Citations by CMS category
CategoryCitations
Smoke Deficiencies5
Egress Deficiencies2
Miscellaneous Deficiencies1
Construction Deficiencies1
Gas, Vacuum, and Electrical Systems Deficiencies1
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

November 21, 2024 — 4 citations

Citations issued on November 21, 2024
TagWhat the surveyor checksStatus
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (January 28, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (January 28, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 28, 2025)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (January 28, 2025)

October 19, 2022 — 3 citations

Citations issued on October 19, 2022
TagWhat the surveyor checksStatus
K-0112Add automatic sprinklers after major renovation.Deficient, Provider has date of correction (November 18, 2022)
K-0221Provide rooms that can be unlocked from inside without a key.Deficient, Provider has date of correction (November 18, 2022)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (November 18, 2022)

October 5, 2021 — 4 citations

Citations issued on October 5, 2021
TagWhat the surveyor checksStatus
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (November 19, 2021)
K-0331Construct fire resistant interior walls.Deficient, Provider has date of correction (October 19, 2021)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (October 19, 2021)
K-0915Have proper power supply for life support equipment.Deficient, Provider has date of correction (October 19, 2021)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.