Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

AUBURN POST ACUTE

AUBURN, WA · 96 certified beds · Last Life Safety survey May 6, 2026

CMS Certification Number 505355 · first certified November 1989

Ownership

Independently operated (no chain recorded by CMS) · For profit - Corporation

  • Ownership changed February 1, 2021 (change of ownership)from EMPRES AT AUBURN LLC
61
Citations on file
CMS's current file
4
Life Safety surveys
CMS's current file
16
Tags cited more than once
Across separate surveys
19
Inspection & testing records
Of the citations on file

Position within WA

61 citations — more than 93% of the 193 certified nursing homes in WA. Compared within WA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 20 citations; the earlier surveys on file averaged 13.7. With 4 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens April 2027 — about 5 months from now. This facility’s last Life Safety survey was May 2026. Facilities in WA are typically surveyed 12–15 months after the last one (median 13), measured over 320 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about AUBURN POST ACUTE

One email when it happens. No account; stop it any time with one click.

Which alerts

5 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

16 of the 61 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

18 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 61 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
  • F-0926 Have policies on smoking.
  • F-0908 Keep all essential equipment working safely.

How that compares

Citations in CMS's current file

Compared with the median facility in WA, and nationally. Surveyors differ markedly between states, so the WA figure is the meaningful one.

This facility61WA median31National median11
Citations in CMS's current file, compared
MeasureCitations
This facility61
Median facility in WA31
Median facility nationally11

Survey history

Citations at each Life Safety survey
192023-09212025-0112026-02202026-05
Citations at each Life Safety survey
Survey dateCitations
September 28, 202319
January 31, 202521
February 25, 20261
May 6, 202620

Most-cited tags

Most-cited tags at this facility
K-05113K-09143K-03533K-02113K-03743K-07613E-00372E-00152
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0511Have properly installed electrical wiring and gas equipment.32026-05-06
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.32026-05-06
K-0353Inspect, test, and maintain automatic sprinkler systems.32026-05-06
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.32026-05-06
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.32026-05-06
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.32026-05-06
E-0037Establish staff and initial training requirements.22026-05-06
E-0015Address subsistence needs for staff and patients.22026-05-06

What the citations cover

Citations by CMS category
  • Emergency Preparedness Deficiencies 16
  • Smoke Deficiencies 15
  • Gas, Vacuum, and Electrical Systems Deficiencies 9
  • Egress Deficiencies 8
  • Other 13
Citations by CMS category
CategoryCitations
Emergency Preparedness Deficiencies16
Smoke Deficiencies15
Gas, Vacuum, and Electrical Systems Deficiencies9
Egress Deficiencies8
Miscellaneous Deficiencies7
Services Deficiencies5
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 6, 2026 — 20 citations

Citations issued on May 6, 2026
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (June 9, 2026)
E-0007Address patient/client population and determine types of services needed.Deficient, Provider has date of correction (June 9, 2026)
E-0009Include a process for Emergency Preparedness collaboration.Deficient, Provider has date of correction (August 6, 2026)
E-0013Develop Emergency Preparedness policies and procedures.Deficient, Provider has date of correction (June 9, 2026)
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (June 9, 2026)
E-0035Provide family notifications of emergency plan.Deficient, Provider has date of correction (June 9, 2026)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (August 6, 2026)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (June 9, 2026)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (August 6, 2026)
K-0271Have exits that are accessible at all times.Deficient, Provider has date of correction (June 9, 2026)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (August 6, 2026)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (June 9, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 9, 2026)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (June 9, 2026)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (June 9, 2026)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (August 6, 2026)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (June 9, 2026)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (August 6, 2026)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (August 6, 2026)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (August 6, 2026)

February 25, 2026 — 1 citation

Citations issued on February 25, 2026
TagWhat the surveyor checksStatus
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (April 1, 2026)

January 31, 2025 — 21 citations

Citations issued on January 31, 2025
TagWhat the surveyor checksStatus
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (March 13, 2025)
K-0100Meet other general requirements.Deficient, Provider has date of correction (February 28, 2025)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (February 28, 2025)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (February 28, 2025)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (February 28, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (March 24, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (February 28, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 24, 2025)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (March 24, 2025)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (April 30, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (April 30, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (March 24, 2025)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (April 30, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (April 30, 2025)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (March 24, 2025)
K-0753Have restrictions on the use of highly flammable decorations.Deficient, Provider has date of correction (April 30, 2025)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (March 24, 2025)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (March 24, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (February 28, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (April 30, 2025)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (April 30, 2025)

September 28, 2023 — 19 citations

Citations issued on September 28, 2023
TagWhat the surveyor checksStatus
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (October 25, 2023)
E-0025Create arrangements with other facilities to receive patients.Deficient, Provider has date of correction (October 25, 2023)
E-0026Establish roles under a Waiver declared by secretary.Deficient, Provider has date of correction (October 25, 2023)
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (October 25, 2023)
E-0035Provide family notifications of emergency plan.Deficient, Provider has date of correction (October 25, 2023)
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (October 25, 2023)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (October 25, 2023)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (October 25, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (October 25, 2023)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (October 25, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 25, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (October 25, 2023)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (October 25, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (October 25, 2023)
K-0531Have elevators that firefighters can control in the event of a fire.Deficient, Provider has date of correction (October 25, 2023)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (October 25, 2023)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (October 25, 2023)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (October 25, 2023)
K-0926Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.Deficient, Provider has date of correction (October 25, 2023)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.