Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Colville Health and Rehabilitation of Cascadia
COLVILLE, WA · 92 certified beds · Last Life Safety survey May 23, 2025
CMS Certification Number 505275 · first certified September 1983
Ownership
Operated by CASCADIA HEALTHCARE · For profit - Corporation
- Ownership changed August 1, 2022 (change of ownership)from CARE CENTER COLVILLE INC.
Position within WA
17 citations — more than 16% of the 193 certified nursing homes in WA. Compared within WA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (May 2026 to August 2026), and past the point by which nine in ten WA facilities have been surveyed. This facility’s last Life Safety survey was May 2025. Facilities in WA are typically surveyed 12–15 months after the last one (median 13), measured over 320 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Colville Health and Rehabilitation of Cascadia
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
7 of the 17 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
12 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
How that compares
Compared with the median facility in WA, and nationally. Surveyors differ markedly between states, so the WA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 17 |
| Median facility in WA | 31 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 3, 2023 | 5 |
| May 16, 2024 | 5 |
| May 23, 2025 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | 2 | 2024-05-16 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-05-23 |
| K-0100 | Meet other general requirements. | 2 | 2025-05-23 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2023-02-03 |
| E-0025 | Create arrangements with other facilities to receive patients. | 1 | 2023-02-03 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-05-23 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2024-05-16 |
| E-0020 | Establish policies and procedures including evacuation. | 1 | 2025-05-23 |
What the citations cover
- Emergency Preparedness Deficiencies 7
- Smoke Deficiencies 5
- Construction Deficiencies 2
- Services Deficiencies 1
- Other 2
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 7 |
| Smoke Deficiencies | 5 |
| Construction Deficiencies | 2 |
| Services Deficiencies | 1 |
| Egress Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 23, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0007 | Address patient/client population and determine types of services needed. | Deficient, Provider has date of correction (June 18, 2025) |
| E-0020 | Establish policies and procedures including evacuation. | Deficient, Provider has date of correction (June 18, 2025) |
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (June 18, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 18, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 18, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 18, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 18, 2025) |
May 16, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (May 29, 2024) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (May 29, 2024) |
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (May 29, 2024) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (May 29, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 29, 2024) |
February 3, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (February 28, 2023) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (February 28, 2023) |
| E-0025 | Create arrangements with other facilities to receive patients. | Deficient, Provider has date of correction (February 28, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 28, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (February 28, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.