Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Enumclaw Health and Rehabilitation

ENUMCLAW, WA · 92 certified beds · Last Life Safety survey June 13, 2025

CMS Certification Number 505400 · first certified November 1991

Ownership

Operated by EVERGREEN HEALTHCARE GROUP · For profit - Limited Liability company

  • Ownership changed August 31, 2023 (change of ownership)to ENUMCLAW HEALTH & REHABILITATION CENTER from EVERGREEN WASHINGTON HEALTHCARE ENUMCLAW, LLC
21
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
4
Tags cited more than once
Across separate surveys
10
Inspection & testing records
Of the citations on file

Position within WA

21 citations — more than 26% of the 193 certified nursing homes in WA. Compared within WA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 8. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (May 2026 to September 2026). Most WA facilities have been surveyed by September 2026. This facility’s last Life Safety survey was June 2025. Facilities in WA are typically surveyed 12–15 months after the last one (median 13), measured over 320 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Enumclaw Health and Rehabilitation

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

2 of the 21 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

7 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 21 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in WA, and nationally. Surveyors differ markedly between states, so the WA figure is the meaningful one.

This facility21WA median31National median11
Citations on file over three years, compared
MeasureCitations
This facility21
Median facility in WA31
Median facility nationally11

Survey history

Citations at each Life Safety survey
62023-02102024-0552025-06
Citations at each Life Safety survey
Survey dateCitations
February 7, 20236
May 16, 202410
June 13, 20255

Most-cited tags

Most-cited tags at this facility
K-09203K-03452K-07532K-03532E-00311K-03741K-09231K-07511
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0920Ensure proper usage of power strips and extension cords.32025-06-13
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22025-06-13
K-0753Have restrictions on the use of highly flammable decorations.22024-05-16
K-0353Inspect, test, and maintain automatic sprinkler systems.22025-06-13
E-0031Provide emergency officials' contact information.12025-06-13
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12025-06-13
K-0923Have proper medical gas storage and administration areas.12023-02-07
K-0751Have restrictions on the use of flammable curtains.12024-05-16

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 6
  • Miscellaneous Deficiencies 6
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Emergency Preparedness Deficiencies 2
  • Other 2
Citations by CMS category
CategoryCitations
Smoke Deficiencies6
Miscellaneous Deficiencies6
Gas, Vacuum, and Electrical Systems Deficiencies5
Emergency Preparedness Deficiencies2
Services Deficiencies1
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 13, 2025 — 5 citations

Citations issued on June 13, 2025
TagWhat the surveyor checksStatus
E-0031Provide emergency officials' contact information.Deficient, Provider has date of correction (July 14, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (July 14, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 14, 2025)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (July 14, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (July 14, 2025)

May 16, 2024 — 10 citations

Citations issued on May 16, 2024
TagWhat the surveyor checksStatus
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (June 1, 2024)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (June 1, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (June 1, 2024)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (June 1, 2024)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (June 1, 2024)
K-0751Have restrictions on the use of flammable curtains.Deficient, Provider has date of correction (June 1, 2024)
K-0753Have restrictions on the use of highly flammable decorations.Deficient, Provider has date of correction (June 1, 2024)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (June 1, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (June 1, 2024)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (June 1, 2024)

February 7, 2023 — 6 citations

Citations issued on February 7, 2023
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (February 21, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (February 21, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (February 21, 2023)
K-0753Have restrictions on the use of highly flammable decorations.Deficient, Provider has date of correction (February 21, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (February 21, 2023)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (February 21, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.