Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
BRIARWOOD AT TIMBER RIDGE
ISSAQUAH, WA · 45 certified beds · Last Life Safety survey December 16, 2025
CMS Certification Number 505518 · first certified June 2008
Ownership
Operated by LIFE CARE SERVICES · For profit - Corporation
- Ownership changed June 1, 2020 (change of ownership)from LCS-WESTMINSTER PARTNERSHIP III LLP
Position within WA
51 citations — more than 85% of the 193 certified nursing homes in WA. Compared within WA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 18 citations; the earlier surveys in the window averaged 16.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2026 — about 2 months from now. This facility’s last Life Safety survey was December 2025. Facilities in WA are typically surveyed 12–15 months after the last one (median 13), measured over 320 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about BRIARWOOD AT TIMBER RIDGE
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
18 of the 51 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 51 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in WA, and nationally. Surveyors differ markedly between states, so the WA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 51 |
| Median facility in WA | 31 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 11, 2023 | 26 |
| October 25, 2024 | 7 |
| December 16, 2025 | 18 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | 3 | 2025-12-16 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2025-12-16 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2025-12-16 |
| E-0036 | Establish emergency prep training and testing. | 2 | 2025-12-16 |
| E-0024 | Establish policies and procedures for volunteers. | 2 | 2025-12-16 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-12-16 |
| E-0039 | Conduct testing and exercise requirements. | 2 | 2025-12-16 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2024-10-25 |
What the citations cover
- Emergency Preparedness Deficiencies 18
- Smoke Deficiencies 11
- Gas, Vacuum, and Electrical Systems Deficiencies 9
- Services Deficiencies 5
- Other 8
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 18 |
| Smoke Deficiencies | 11 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 9 |
| Services Deficiencies | 5 |
| Miscellaneous Deficiencies | 4 |
| Construction Deficiencies | 2 |
| Egress Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 16, 2025 — 18 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (January 21, 2026) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (January 21, 2026) |
| E-0020 | Establish policies and procedures including evacuation. | Deficient, Provider has date of correction (January 21, 2026) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (January 21, 2026) |
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (January 21, 2026) |
| E-0033 | Establish methods for sharing information. | Deficient, Provider has date of correction (January 21, 2026) |
| E-0034 | Provide a means of sharing information on occupancy/needs. | Deficient, Provider has date of correction (January 21, 2026) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (January 21, 2026) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (January 21, 2026) |
| K-0132 | Meet requirements for outpatient facilities located next to inpatient facilities separated by fire resistive construction. | Deficient, Provider has date of correction (January 21, 2026) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (January 21, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 21, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 21, 2026) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (January 21, 2026) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (January 21, 2026) |
| K-0753 | Have restrictions on the use of highly flammable decorations. | Deficient, Provider has date of correction (January 21, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (January 21, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (January 21, 2026) |
October 25, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (November 29, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (November 29, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (November 29, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (November 29, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 29, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (November 29, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (November 29, 2024) |
July 11, 2023 — 26 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (August 8, 2023) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (August 8, 2023) |
| E-0023 | Establish policies and procedures for medical documentation. | Deficient, Provider has date of correction (August 8, 2023) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (August 8, 2023) |
| E-0035 | Provide family notifications of emergency plan. | Deficient, Provider has date of correction (August 8, 2023) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (August 8, 2023) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (August 8, 2023) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Waiver has been granted (August 8, 2023) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Waiver has been granted (August 8, 2023) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0524 | Ensure that gas fire places are out of the reach of patients and can be shut off if unit is working improperly. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (August 8, 2023) |
| K-0926 | Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk. | Deficient, Provider has date of correction (August 8, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.