Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
SPOKANE VALLEY HEALTH AND REHABILITATION OF CASCAD
SPOKANE VALLEY, WA · 97 certified beds · Last Life Safety survey November 24, 2025
CMS Certification Number 505099 · first certified January 1967
Ownership
Operated by CASCADIA HEALTHCARE · For profit - Limited Liability company
- Ownership changed July 1, 2023 (change of ownership)to SPOKANE VALLEY HEALTH AND REHABILITATION OF CASCADIA from THE EVANGELICAL LUTHERAN GOOD SAMARITAN SOCIETY
Position within WA
32 citations — more than 54% of the 193 certified nursing homes in WA. Compared within WA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 13 citations; the earlier surveys in the window averaged 9.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 1 month from now. This facility’s last Life Safety survey was November 2025. Facilities in WA are typically surveyed 12–15 months after the last one (median 13), measured over 320 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about SPOKANE VALLEY HEALTH AND REHABILITATION OF CASCAD
One email when it happens. No account; stop it any time with one click.
5 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
8 of the 32 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 32 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in WA, and nationally. Surveyors differ markedly between states, so the WA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 32 |
| Median facility in WA | 31 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 10, 2023 | 9 |
| August 13, 2024 | 10 |
| November 24, 2025 | 13 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2025-11-24 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 3 | 2025-11-24 |
| K-0363 | Install corridor and hallway doors that block smoke. | 3 | 2025-11-24 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2025-11-24 |
| E-0039 | Conduct testing and exercise requirements. | 2 | 2024-08-13 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2024-08-13 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 2 | 2025-11-24 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2025-11-24 |
What the citations cover
- Smoke Deficiencies 15
- Emergency Preparedness Deficiencies 8
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Services Deficiencies 2
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 15 |
| Emergency Preparedness Deficiencies | 8 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Services Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
November 24, 2025 — 13 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (December 23, 2025) |
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (December 23, 2025) |
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (December 23, 2025) |
| K-0233 | Install resident room doors of proper design and width. | Deficient, Provider has date of correction (December 23, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (December 23, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 23, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 23, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (December 23, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 23, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (December 23, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (December 23, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (December 23, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (December 23, 2025) |
August 13, 2024 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (September 11, 2024) |
| E-0018 | Establish procedures for tracking staff and patients during an emergency. | Deficient, Provider has date of correction (September 11, 2024) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (October 16, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Waiver has been granted (October 16, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (September 11, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (September 11, 2024) |
April 10, 2023 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (May 11, 2023) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (May 11, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 11, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (May 11, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (May 11, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 11, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 11, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (May 11, 2023) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (May 11, 2023) |