Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Royal Park Health and Rehabilitation

SPOKANE, WA · 164 certified beds · Last Life Safety survey May 5, 2026

CMS Certification Number 505379 · first certified June 1991

Ownership

Operated by EVERGREEN HEALTHCARE GROUP · For profit - Limited Liability company

  • Ownership changed August 31, 2023 (change of ownership)to ROYAL PARK HEALTH & REHABILITATION CENTER from SPOKANE ROYAL PARK CARE LLC
28
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
6
Tags cited more than once
Across separate surveys
13
Inspection & testing records
Of the citations on file

Position within WA

28 citations — more than 43% of the 193 certified nursing homes in WA. Compared within WA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 7 citations; the earlier surveys in the window averaged 10.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens April 2027 — about 7 months from now. This facility’s last Life Safety survey was May 2026. Facilities in WA are typically surveyed 12–15 months after the last one (median 13), measured over 320 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Royal Park Health and Rehabilitation

One email when it happens. No account; stop it any time with one click.

Which alerts

4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

6 of the 28 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

8 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 28 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.

How that compares

Citations on file over three years

Compared with the median facility in WA, and nationally. Surveyors differ markedly between states, so the WA figure is the meaningful one.

This facility28WA median31National median11
Citations on file over three years, compared
MeasureCitations
This facility28
Median facility in WA31
Median facility nationally11

Survey history

Citations at each Life Safety survey
62023-10152025-0172026-05
Citations at each Life Safety survey
Survey dateCitations
October 4, 20236
January 17, 202515
May 5, 20267

Most-cited tags

Most-cited tags at this facility
K-03633K-03452K-07122K-03532K-03742K-09202E-00391E-00131
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0363Install corridor and hallway doors that block smoke.32026-05-05
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22026-05-05
K-0712Have simulated fire drills held at unexpected times.22026-05-05
K-0353Inspect, test, and maintain automatic sprinkler systems.22025-01-17
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.22026-05-05
K-0920Ensure proper usage of power strips and extension cords.22026-05-05
E-0039Conduct testing and exercise requirements.12025-01-17
E-0013Develop Emergency Preparedness policies and procedures.12025-01-17

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 11
  • Emergency Preparedness Deficiencies 6
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Miscellaneous Deficiencies 2
  • Other 4
Citations by CMS category
CategoryCitations
Smoke Deficiencies11
Emergency Preparedness Deficiencies6
Gas, Vacuum, and Electrical Systems Deficiencies5
Miscellaneous Deficiencies2
Services Deficiencies2
Egress Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 5, 2026 — 7 citations

Citations issued on May 5, 2026
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (May 13, 2026)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (May 13, 2026)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (May 11, 2026)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (May 11, 2026)
K-0531Have elevators that firefighters can control in the event of a fire.Deficient, Provider has date of correction (May 11, 2026)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (May 11, 2026)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (May 11, 2026)

January 17, 2025 — 15 citations

Citations issued on January 17, 2025
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (February 10, 2025)
E-0007Address patient/client population and determine types of services needed.Deficient, Provider has date of correction (February 10, 2025)
E-0013Develop Emergency Preparedness policies and procedures.Deficient, Provider has date of correction (February 12, 2025)
E-0020Establish policies and procedures including evacuation.Deficient, Provider has date of correction (February 10, 2025)
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (February 10, 2025)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (February 10, 2025)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (February 3, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (February 12, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (February 3, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (February 12, 2025)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (February 12, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (January 31, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (February 3, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (February 12, 2025)
K-0926Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.Deficient, Provider has date of correction (February 10, 2025)

October 4, 2023 — 6 citations

Citations issued on October 4, 2023
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 27, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (October 27, 2023)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (October 27, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (October 27, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (October 27, 2023)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (October 27, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.