Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

PARK ROSE CARE CENTER

TACOMA, WA · 139 certified beds · Last Life Safety survey July 2, 2025

CMS Certification Number 505239 · first certified April 1976

Ownership

Operated by REGENCY PACIFIC MANAGEMENT · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

57
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
16
Tags cited more than once
Across separate surveys
25
Inspection & testing records
Of the citations on file

Position within WA

57 citations — more than 92% of the 193 certified nursing homes in WA. Compared within WA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 29 citations; the earlier surveys in the window averaged 14. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (June 2026 to September 2026). Most WA facilities have been surveyed by October 2026. This facility’s last Life Safety survey was July 2025. Facilities in WA are typically surveyed 12–15 months after the last one (median 13), measured over 320 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about PARK ROSE CARE CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

8 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

5 of the 57 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

8 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 57 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0908 Keep all essential equipment working safely.

How that compares

Citations on file over three years

Compared with the median facility in WA, and nationally. Surveyors differ markedly between states, so the WA figure is the meaningful one.

This facility57WA median31National median11
Citations on file over three years, compared
MeasureCitations
This facility57
Median facility in WA31
Median facility nationally11

Survey history

Citations at each Life Safety survey
172023-08112024-09292025-07
Citations at each Life Safety survey
Survey dateCitations
August 7, 202317
September 18, 202411
July 2, 202529

Most-cited tags

Most-cited tags at this facility
K-07123K-03453K-03533K-03243K-09183K-02222K-09142K-02812
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0712Have simulated fire drills held at unexpected times.32025-07-02
K-0345Have approved installation, maintenance and testing program for fire alarm systems.32025-07-02
K-0353Inspect, test, and maintain automatic sprinkler systems.32025-07-02
K-0324Provide properly protected cooking facilities.32025-07-02
K-0918Have generator or other power source capable of supplying service within 10 seconds.32025-07-02
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.22025-07-02
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.22025-07-02
K-0281Install proper backup exit lighting.22025-07-02

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 17
  • Gas, Vacuum, and Electrical Systems Deficiencies 13
  • Egress Deficiencies 11
  • Miscellaneous Deficiencies 5
  • Other 11
Citations by CMS category
CategoryCitations
Smoke Deficiencies17
Gas, Vacuum, and Electrical Systems Deficiencies13
Egress Deficiencies11
Miscellaneous Deficiencies5
Services Deficiencies5
Emergency Preparedness Deficiencies5
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

July 2, 2025 — 29 citations

Citations issued on July 2, 2025
TagWhat the surveyor checksStatus
E-0009Include a process for Emergency Preparedness collaboration.Deficient, Provider has date of correction (August 1, 2025)
E-0020Establish policies and procedures including evacuation.Deficient, Provider has date of correction (August 1, 2025)
E-0025Create arrangements with other facilities to receive patients.Deficient, Provider has date of correction (August 1, 2025)
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (August 1, 2025)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (August 1, 2025)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (August 1, 2025)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (August 1, 2025)
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (August 1, 2025)
K-0232Have corridors or aisles that are unobstructed and are at least 8 feet in width.Deficient, Provider has date of correction (August 1, 2025)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (September 18, 2025)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (September 18, 2025)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (September 18, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (August 1, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (August 1, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (September 29, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (September 29, 2025)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (August 1, 2025)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (September 18, 2025)
K-0531Have elevators that firefighters can control in the event of a fire.Deficient, Provider has date of correction (August 1, 2025)
K-0541Install properly constructed and protected linen or trash chutes.Deficient, Provider has date of correction (August 1, 2025)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (August 1, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (August 1, 2025)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (September 18, 2025)
K-0915Have proper power supply for life support equipment.Deficient, Provider has date of correction (August 1, 2025)
K-0916Have a battery powered remote alarm panel in a location accessible by operating personnel.Deficient, Provider has date of correction (August 1, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (August 1, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (August 1, 2025)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (August 1, 2025)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (August 1, 2025)

September 18, 2024 — 11 citations

Citations issued on September 18, 2024
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (October 17, 2024)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (October 17, 2024)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (October 17, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (October 17, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (November 12, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 17, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (October 17, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (October 17, 2024)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (November 18, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (October 17, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (November 12, 2024)

August 7, 2023 — 17 citations

Citations issued on August 7, 2023
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (September 5, 2023)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (September 5, 2023)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (September 5, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (September 5, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (September 5, 2023)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (September 5, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (September 5, 2023)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (September 5, 2023)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (September 5, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (September 5, 2023)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (September 5, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (September 5, 2023)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (September 5, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (September 5, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (September 5, 2023)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (September 5, 2023)
K-0926Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.Deficient, Provider has date of correction (September 5, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.