Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CLEARVIEW
JUNEAU, WI · 40 certified beds · Last Life Safety survey August 7, 2025
CMS Certification Number 525453 · first certified December 1989
Ownership
Independently operated (no chain recorded by CMS) · Government - County
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within WI
7 citations — more than 8% of the 323 certified nursing homes in WI. Compared within WI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: September 2026 to November 2026. This facility’s last Life Safety survey was August 2025. Facilities in WI are typically surveyed 13–15 months after the last one (median 14), measured over 516 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CLEARVIEW
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
1 of the 7 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in WI, and nationally. Surveyors differ markedly between states, so the WI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 7 |
| Median facility in WI | 17 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 22, 2023 | 3 |
| June 21, 2024 | 2 |
| August 7, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2024-06-21 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-08-07 |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | 1 | 2023-03-22 |
| K-0541 | Install properly constructed and protected linen or trash chutes. | 1 | 2024-06-21 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2025-08-07 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-03-22 |
| E-0013 | Develop Emergency Preparedness policies and procedures. | 1 | 2023-03-22 |
What the citations cover
- Smoke Deficiencies 3
- Services Deficiencies 2
- Emergency Preparedness Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Services Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 7, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 4, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 4, 2025) |
June 21, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Waiver has been granted (September 10, 2024) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (July 5, 2024) |
March 22, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (April 6, 2023) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (April 6, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (April 6, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.