Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PLEASANT VIEW NURSING HOME
MONROE, WI · 96 certified beds · Last Life Safety survey September 18, 2025
CMS Certification Number 525643 · first certified May 1998
Also on this campus
The same campus holds a state-licensed assisted living facility, with its own state record on the Assisted Living Index: Pleasant View Orourke Dementia Stabilization Unit (N3150 Highway 81). Matched by the telephone number the two records share. The records are separate and are never added together.
Ownership
Independently operated (no chain recorded by CMS) · Government - County
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within WI
23 citations — more than 67% of the 323 certified nursing homes in WI. Compared within WI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 8 citations; the earlier surveys on file averaged 7.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: October 2026 to December 2026. This facility’s last Life Safety survey was September 2025. Facilities in WI are typically surveyed 13–15 months after the last one (median 14), measured over 519 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about PLEASANT VIEW NURSING HOME
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 23 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in WI, and nationally. Surveyors differ markedly between states, so the WI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 23 |
| Median facility in WI | 17 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 21, 2023 | 8 |
| July 9, 2024 | 7 |
| September 18, 2025 | 8 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2025-09-18 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 3 | 2025-09-18 |
| K-0912 | Have power receptacles that are properly grounded. | 2 | 2025-09-18 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2025-09-18 |
| K-0281 | Install proper backup exit lighting. | 1 | 2023-03-21 |
| K-0919 | Meet requirements for the use of electrical equipment. | 1 | 2023-03-21 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2025-09-18 |
| K-0541 | Install properly constructed and protected linen or trash chutes. | 1 | 2025-09-18 |
What the citations cover
- Smoke Deficiencies 12
- Services Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 3
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 12 |
| Services Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 3 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 18, 2025 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0132 | Meet requirements for outpatient facilities located next to inpatient facilities separated by fire resistive construction. | Deficient, Provider has date of correction (October 14, 2025) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (October 14, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 14, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 14, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (October 14, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (October 14, 2025) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (October 14, 2025) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (October 14, 2025) |
July 9, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (July 30, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (July 30, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 30, 2024) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (July 30, 2024) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (July 30, 2024) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (July 30, 2024) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (July 30, 2024) |
March 21, 2023 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (April 17, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 17, 2023) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (April 17, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (April 17, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 17, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (April 19, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (April 19, 2023) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (April 17, 2023) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.