Sheboygan Progressive Health Services
Sheboygan, WI · 50 certified beds · Last Life Safety survey August 13, 2025
CMS Certification Number 525511 · first certified March 1993
Ownership
Operated by NORTH SHORE HEALTHCARE · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within WI
12 citations — more than 25% of the 323 certified nursing homes in WI. Compared within WI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: September 2026 to November 2026. This facility’s last Life Safety survey was August 2025. Facilities in WI are typically surveyed 13–15 months after the last one (median 14), measured over 516 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Sheboygan Progressive Health Services
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 12 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 12 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in WI, and nationally. Surveyors differ markedly between states, so the WI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 12 |
| Median facility in WI | 17 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 5, 2023 | 2 |
| June 19, 2024 | 3 |
| August 13, 2025 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2025-08-13 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2025-08-13 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2025-08-13 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2024-06-19 |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | 1 | 2023-04-05 |
| E-0013 | Develop Emergency Preparedness policies and procedures. | 1 | 2025-08-13 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2025-08-13 |
| K-0711 | Provide a written emergency evacuation plan. | 1 | 2025-08-13 |
What the citations cover
- Smoke Deficiencies 5
- Egress Deficiencies 2
- Services Deficiencies 2
- Emergency Preparedness Deficiencies 1
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Egress Deficiencies | 2 |
| Services Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 13, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (September 8, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (August 29, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 23, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (August 19, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | No revisit needed |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 25, 2025) |
June 19, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (July 17, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (July 17, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Waiver has been granted |
April 5, 2023 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (April 13, 2023) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (April 14, 2023) |